Licensed, bonded and insured  ·  Kaminskiy-certified technicians  ·  Workmanship warranty on every job
Kaminskiy Care + Repair Call 855-695-1195
Unit RenovationsSuite RefreshesRestroomsBreak RoomsPunch Lists

Commercial Remodeling & Tenant Improvements.
Inside Existing Walls.

Technician tapping a vinyl plank into place on the floor of an empty office suite with fresh paint
Commercial RemodelingWRITTEN SCOPE AND SCHEDULE
4.71,150 Google Reviews
BBBBBBAccredited Business
LicensedBonded & Insured
21 Years in Business
Technician tapping a vinyl plank into place on the floor of an empty office suite with fresh paint
7Services, from one unit
to a standing program
Commercial RemodelingWRITTEN SCOPE AND SCHEDULE
21 Years in Business
Finish work inside existing walls, on a written scope and schedule.
THE SHORT ANSWER

Kaminskiy Care and Repair handles commercial remodeling inside existing walls for property managers, owners and facility teams: rental units between leases, office suites, restrooms, break rooms and their cabinets, and the rebuild after a covered loss. Longer jobs run under one lead on a dated schedule. Recurring work runs as a scheduled maintenance program. A true tenant improvement that moves walls, drains or circuits needs plans, a permit and licensed trades, and we say so before pricing. Remodeling is the project end of our commercial handyman services for managed property.

What the category coversUnit renovations, suite refreshes, restroom upgrades, break rooms and cabinets, loss repairs, maintenance programs and punch lists.
Who it is forProperty managers, asset managers, owners, facility managers and office or clinic managers.
Where the line sitsFinish work inside existing walls, on existing plumbing and electrical locations.
Not our workBuild-outs that move walls, exits, drains or power: a general contractor, plans, a permit and licensed trades.
You getA written scope sorted by who does each part, one lead and a closeout file.
★ Google 4.7 · 1,150 reviews●BBB Accredited●Kaminskiy-Certified Technicians●Background Checked Crews●Workmanship Warranty●21 Years of Kaminskiy●
COMMERCIAL REMODELING

Three kinds of work
under one category

The seven pages below sort into space you are renewing, damage you are putting back, and standing work that never quite ends.
SPACE BETWEEN OCCUPANTS

Units and suites that need more than paint

A vacancy is the window. An apartment gets new flooring, cabinets, fixtures and lighting through tenant unit renovations, built to a finish schedule the property repeats. An office gets an office suite refresh: paint, floor, ceiling tiles, lights swapped in kind and doors that latch, with every wall left where it stands.

ROOMS EVERYONE USES

Restrooms, break rooms and worn casework

Shared rooms wear out first and are judged hardest. Commercial restroom upgrades replace fixtures, partitions, accessories and finishes on the plumbing already in the wall. Break room remodels rebuild cabinets, counter, sink and floor together. When the boxes are sound and only hinges, slides or laminate have failed, cabinet and counter repair is the smaller answer.

DAMAGE AND STANDING LISTS

A loss, a deadline or a list that keeps growing

After a leak or a fire has been mitigated, insurance restoration repairs put the finishes back and document them for the adjuster. When a lender, a buyer or a city inspector hands over findings, property punch lists close them line by line. Anything that outgrows a single appointment follows our multi-day project method.

WHAT A VISIT LOOKS LIKE

From the first call
to the closed work order

01Walk the space with the decision maker

We measure, photograph and ask what the space must do and by which date. Building rules on hours, elevators, parking and noise are written down before any price.

02Sort the scope at the permit line

Each item is marked as finish work, as work for a licensed trade, or as work that needs drawings and the building department. You see all three lists.

03Sequence the trades

Tear-out and repairs come first, then paint, then flooring, then cabinets, fixtures and hardware. One lead holds the calendar and tells occupants what happens each day.

04Close with a record

A final walk with you, a short list of touch-ups finished, and a file of photos, product names, colors and warranty papers the next manager can use.

We are a repair and renovation company, licensed, bonded and insured, working inside existing walls on existing plumbing and electrical locations. A build-out that moves partitions, changes an exit, relocates a drain or adds power is a tenant improvement general contractor's job with stamped plans and a permit, and the local building official decides what your space needs. New circuits go to a licensed electrical contractor. Drain and supply changes go to a licensed plumbing contractor. Glass goes to a glazier. Sprinkler and fire alarm changes go to licensed fire protection contractors.
RULES WORTH KNOWING

Three lines that decide
who can do the work

The permit line

In California, the building code exempts painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work from a building permit (section 105.2), and many other jurisdictions keep a comparable list. The exemption never excuses work that breaks the code, and it stops where walls, exits, plumbing or wiring change. Your local building official makes the call, so we ask before we price a borderline item.

The alteration line

The 2010 ADA Standards define an alteration as a change that affects or could affect the usability of a building, and they name remodeling and renovation as examples. Normal maintenance and painting are not alterations unless they affect usability. Under section 202.3, each altered element or space has to meet the applicable requirements, with an allowance where that is technically infeasible. We install to those dimensions and never issue a certification.

The hazardous-material line

Housing built before 1978 falls under the EPA Renovation, Repair and Painting rule when painted surfaces are disturbed, and that rule requires certified firms and lead-safe work practices. In commercial buildings and in residential buildings with more than four units, federal asbestos rules call for a thorough inspection before renovation. Suspect flooring, mastic, texture and ceiling tile are tested first, and abatement belongs to a licensed company.

WHO CALLS US

One crew for the people
who run the property

Property managersVacant units renovated to one finish schedule, so the tenth unit matches the first.
Asset managers and ownersA scope sorted into finish work, licensed-trade work and permit work before any budget is approved.
Facility managersRestrooms and break rooms renewed in phases while the floor stays in use.
Office and clinic managersA suite refreshed over nights and weekends, on a calendar staff can plan around.

Sources for the rules on this page: 2010 ADA Standards for Accessible Design, sections 106.5, 202.3 and 202.4 (U.S. Access Board); California Building Code, section 105.2, Work Exempt from Permit (2025 code excerpt published by the City of Albany, California); U.S. EPA, Lead Renovation, Repair and Painting Program: Contractors; U.S. EPA, Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP); California Contractors State License Board, B General Building Contractor classification.

COMMERCIAL REMODELING SERVICES

Seven ways to renew a space
without a build-out

21 Years in Business Pick the page that matches the job. Each one says what we do, what a licensed trade does, and what a manager should have ready.
WHERE MOST JOBS START

The Sorted Scope

Before a price, every line of the job is sorted into three columns. Finish work we do ourselves: flooring, paint, cabinets, counters, fixtures set where the old ones sat. Licensed-trade work we coordinate: wiring changes, drain moves, fire protection. Permit work is flagged for a general contractor and the building department. You approve the columns, then the numbers.

Unit RenovationsSuite RefreshesRestroom UpgradesBreak Room RemodelsInsurance RepairsPunch Lists
Call About Your Property Get a Free Online Quote
★ THE THREE-COLUMN SCOPEFinished small office suite with new plank flooring, fresh paint, a clean ceiling grid and a kitchenette
Tenant Unit RenovationsApartment units renovated between leases.See the service
Office Suite RefreshA tired suite refreshed without a full build-out.See the service
Insurance Restoration & Water Damage RepairCovered damage documented, rebuilt and closed out.See the service
Restroom UpgradesDated restrooms upgraded fixture by fixture.See the service
Break Room Remodels & CabinetsBreak rooms rebuilt; cabinets and counters repaired.See the service
Scheduled Maintenance ProgramsRecurring visits that work a standing list.See the service
Property Punch ListsInspection and walkthrough lists closed item by item.See the service
WHY MANAGERS CALL

Signs a space needs more
than a work order

Call 855-695-1195
A vacant unit has been shown six times and the kitchen is what prospects mention.
The renewing tenant wants the suite freshened and nobody wants to move a wall.
The restroom works, but its fixtures and partitions date the whole building.
The adjuster approved the loss and the unit is still open to the studs.
A lender's inspection left forty lines and a closing date.
The same small repairs come back every quarter because nobody owns the list.

None of these needs an architect. Each one needs a written scope, a sequence and one person who answers for the calendar. Where a line does need drawings or a licensed trade, the scope says so beside it.

HOW IT WORKS

Three steps from a tired
space to a finished one

Kaminskiy team member answering a call
01
Call or send the list

Send the address, the list or goal, your target date and the building's rules on work hours.

A clear written quote
02
Approve the written scope

We walk the space and return a written scope, sorted by who must do each part, with a schedule.

Kaminskiy technician greeting a client at the door
03
We do the work, you get the record

Work runs in sequence under one lead, and you get progress photos and a closeout file.

The Kaminskiy Guarantee

The work is backed in writing by our workmanship warranty and done by a Kaminskiy-certified, background checked technician.

Workmanship warrantyLicensed, bonded & insuredKaminskiy-certified techniciansBackground checked crews

Spaces we renewed.
Schedules we held.

4.7 of 5 · 1,150 Google reviews across our markets
★★★★★
David fixed our French doors so that they lock securely as they should. He was on time, friendly, professional and he did a great job! We are very pleased.Sonia Alvarez · Google, 3 weeks ago
★★★★★
Originally my appointment was rescheduled to the following day which was an inconvenience. But I’m glad we did because Celso came the next day and he has a lot of expertise. He changed out the rotting wood on the bottom of our door and gave me lots of good...Guess · Google, a month ago
★★★★★
The team at Kaminsky did a wonderful job. I am very pleased with my new bathroom. Francisco does excellent tile work. He installed Toto toilets and seats as well as new faucets beautifully. His finishing with paint and caulk is perfect! The job came in very...Andrew J Howard (A J) · Google, 3 years ago
THE MANAGER'S REMODELING GUIDE

What to settle before
anyone gives you a price

Refresh, renovation or build-out

A refresh changes surfaces: paint, floor, ceiling tile, lamps, hardware. A renovation also replaces what is fastened to the room, such as cabinets, counters, fixtures and partitions, but leaves layout and utilities alone. A build-out, usually called a tenant improvement, changes the plan: walls, exits, plumbing locations, power, sometimes the occupancy. The first two are our work. The third belongs to a general contractor with drawings and a permit.

Who pays, landlord or tenant

The lease decides, and it is worth reading before the walk. Many commercial leases put interior finishes on the tenant and restrooms, corridors and building systems on the owner. A work letter may set an allowance and a standard of finish. We price to whoever signs the scope, and we can split one job into an owner part and a tenant part so each side sees its own lines.

A finish schedule saves the next job

Write down the flooring product and color, the paint color and sheen for walls and trim, the cabinet line, the counter pattern, the faucet and the light fixture. Keep it per property. The next unit or suite is then an order, not a design meeting, and a damaged plank or door can be replaced without a visible patch. We fill in the schedule as part of closeout.

Licensing, stated plainly

In California, Kaminskiy Care and Repair works under contractor license #1106209, a B general building classification, which state law describes as covering structures that need at least two unrelated building trades. Other states draw the line differently, and several license electrical, plumbing and mechanical work separately at any size. Before a project starts we tell you which license rules apply at your address and which parts go to a separately licensed trade.

GOOD QUESTIONS

Remodeling questions
managers ask first

Can't find your answer? Call 855-695-1195 and ask us anything.

Call 855-695-1195

A refresh renews what is already there: paint, flooring, ceiling tiles, light fixtures replaced in kind, cabinets, counters and hardware. A tenant improvement changes the space itself by moving walls, adding rooms, relocating plumbing or adding power. The first is our work. The second needs drawings, a permit and a general contractor, and we tell you early when a wish list has crossed that line.

Often not, sometimes yes. Finish work such as painting, flooring, cabinets and counters is commonly exempt, while changes to walls, exits, plumbing or wiring are not. Rules differ by city and by building type. We flag every line that may need a permit and ask the building department when it is unclear, since the local official has the final word.

Yes. Most of this work happens in occupied buildings. Noisy and dusty steps are scheduled early, late or on weekends, work areas are closed off and cleaned when each shift ends, and occupants get notice of what happens when. A restroom or break room is taken out of service in phases so staff always have one to use.

We do, when the job needs them. Fixtures and devices replaced in kind at existing locations are our own work. Anything that adds a circuit, moves a drain or touches the service equipment goes to a licensed electrical or plumbing contractor, and that part appears as its own line in the scope so you know who is doing what.

By the written scope. Labor, the finish level you choose, the amount of tear-out, after-hours work and the number of trades involved drive the number more than square footage does. You approve the scope and price before anything is ordered, and a change during the job is priced in writing before it is built.

Either way works. Many properties keep a finish schedule with set flooring, paint and fixtures, and we buy to it. If you have stock on site or a national account, we install what you supply after checking quantities and lot numbers. The scope says who supplies each item so nothing is ordered twice.

They can. Under the 2010 ADA Standards an altered element has to meet the current requirements, and an alteration to a primary function area can bring the path of travel into the job. We install to the published dimensions and point out likely triggers. Deciding what your building owes is for the building official, an architect or an access specialist.

RATHER TYPE THAN TALK?

Tell us about the space

Send the address, what the space is used for, the list or goal, the date it has to be ready and a few photos. A written scope comes back. Or call 855-695-1195.

Tell us about the property
Agree

By providing your number and clicking on "Submit", you agree to be contacted by Kaminskiy Care & Repair about your project via phone, email, and text messages, including marketing messages about special offers, discounts, and promotions. Consent is not a condition of purchase. Message and data rates may apply. You can unsubscribe at any time by replying STOP. For help, reply HELP. Message frequency will vary.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

REMODELING

Every commercial remodeling service

All Commercial Services

Ready to renew a space without a build-out?

One scope sorted by trade. One lead. A closeout file when the work is done.

Call 855-695-1195 Get a Free Online Quote
We answer in under three rings, 24/7.
Call Now Text